BETON KONTAKT – Adhesive primer TRIORA
Save the link in your social network that would not lose.
Write expert
-
Drying time
6 hours at a temperature of + 23 ± 2 ° С and air humidity 50 ± 5% for one layer
-
Coverage
2-4 m² / kg per layer depending on the roughness and absorbency of the surfaces
-
Thinner
Water
-
Type of works
Inside and outside the permises